Eight Dimensions

A WonderLend Hubs reading of the proposed framework

A cap is not a number.
It is a rate surface.

Work out what determines the maximum commission on a single policy under IRDAI’s proposed framework, and you do not get a number. You get eight inputs — and one of them moves on every policy you have already written.

This is our reading of the framework, not an IRDAI formulation. Comments on the paper close 25 October 2026.

The eight inputs

01

Product type

Term, savings, annuity and group each carry a different ceiling. Annuity gets half a point; annuity bought from NPS corpus gets nothing at all.

02

Premium mode

Single premium and multi-year premium are capped separately, at very different levels — 1% against 20% on individual savings.

03

Premium paying term band

Below 5, 5, 6–8, 9, and 10 and above. Five bands, each with its own first-year limit, from 5% up to 20%.

04

Payee class

Distribution entity or agent — a fixed 1.25 times gap in the first year on individual life, widening to as much as 2.5 times on renewal.

05

Policy year

The renewal trail steps half a point every three years from the sixth policy year, capped at 7%.

06

Geography

Business in under-served areas multiplies the applicable first-year cap by 1.1 or 1.2 — a multiplier on the limit, not added percentage points.

07

Sale context

Sold alongside a loan, the same product leaves its own grid entirely for a separate and much lower schedule.

08

Absolute ceiling

Group single-premium term carries a rupee cap — ₹20 lakh or ₹30 lakh — running beside the percentage. Both bind.

Why one of them is different

Seven of those eight are fixed at the point of sale. Product, premium mode, term band, payee, geography, sale context and the rupee ceiling are all decided when the policy is written, and they do not change afterwards.

Policy year does. It advances every year, on every policy already on the books, for as long as the policy runs.

The correct rate moves under a book that is not itself changing. Nothing was sold, nothing was cancelled, nothing was repriced — and the right answer is different from last year’s.

And it has to be provable

The paper mandates a cost audit of distribution cost, with the results placed in the public domain, alongside EoM and commission performance for insurers and large distribution entities. So the calculation is not only performed — it is reconstructed, by someone outside the company, and published.

That changes what a commission system has to be able to do. It is no longer enough to arrive at the right payment. The system has to be able to show how it arrived there, per policy and per period, years after the fact, against the rules that were in force at the time.

Compliance becomes a property of the engine that computes the payout — not a report produced afterwards by people reconciling four systems.

Three questions worth asking internally

How many systems would have to agree to produce one commission number?If the answer is four, the cost audit will find the seams. It is designed to.
Can a scheme change be made without a software release?The difference between configuration and release is the difference between weeks and quarters — and the window for responding to this paper is weeks.
Can you reconstruct a payout made three years ago, under the rules in force then?That is what lineage means, and it is what an external examiner will ask for.

What is settled, and what is not

The framework is primaryThe expense limits, the widened definition of commission, the architecture, the conduct rules, the cost audit and the design principles come from IRDAI’s press release of 23 September 2026 and its Annexure A, read directly.
The eight-dimension framing is oursIt is a reading of the proposed framework by WonderLend Hubs, not an IRDAI formulation, and we say so rather than presenting it as the regulator’s own structure.
The rates are not primaryEvery percentage here comes from published reporting of Part 1, which has not been read. Verify before external use — and remember this is a consultation paper, not a regulation.

Measure it rather than estimate it

The four-week readiness review establishes whether a scheme change can be modelled and deployed at your scale today. One channel, your own payout data, at our cost — and the answer is useful whatever the final rates turn out to be.

What it needs from you

  • A named owner in distribution, finance or actuarial
  • Access to policy, agency and payroll data
  • Two years of historical payout data
  • Your current commission structure by product and channel

What it produces

  • Time-to-model measured, not estimated
  • A prioritised gap list against the eight-dimension rate surface
  • A reconstruction test: one historical payout, proved end to end
  • Distributor-level winners and losers under the proposed caps
Start a conversation